Instituto Vital Brazil – Cires
Construction of boiler buildings, substations, generators and waste.
Construction of boiler buildings, substations, generators and waste.
Partitions, air conditioning ISO 7 (class 10,000) and cold room, for plasma production (raw material for the production of sera).
Clean Room ISO 7 (class 10,000) and ISO 8 (class 100,000).
Partition, doors, passtrough and lining. Work: Sespo.
15,000 m² of partitions, liner and GMP standard doors.
Partitions and air conditioning for ISO 7 (class 10,000) areas – for areas of ointment, liquid, solid and semi-solid.
Rockwool partitions and air conditioning with humidity control (8 grams / 50º C).
Partitions, lining, GMP standard doors and air conditioning to ISO 7 area (class 10,000), to cell therapy center.
Partitions, lining, standard GMP doors and air conditioning for ISO 7 area (class 10,000), for pharmacotechnics.
Partitions, lining, standard GMP doors and air conditioning for ISO 5 area (class 100), for Bone bank.
Clean Rooms ISO 7 (class 10,000) and 8 (class 100,000) – Bank of tissues and eyes.
Partitions and air conditioning for weighing area.
Partitions, air conditioning ISO 7 (class 10,000) and cold room.
Cleanroom ISO 8 (class 100.00) for the production of herbal medicines.
Clean room on the turn key regime ISO 8 (class 100,000) / ISO 7 (10,000) for the area of injectables.